
Contact: https://bruton-ltd.com/contact/

Our fleet12 x VLCC under construction
Bruton LTD. has 8 VLCC vessels under construction at NTS Shipyard in China with delivery between 2026 and 2029, and 4 VLCC vessels under construction at Yantai CIMC Raffles China in 2028.

Bruton Ltd. stock at Oslo Stock Exchange. 6th of August 2026 08:30 CET


General Inquiries :
Email: post@gen2energy.com
Åfjord
is located at a peninsula that is also home to Europe’s largest onshore wind project, but lacks both widespread, energy intensive industry and a solid long-distance transmission network.

Mosjøen where Gen2 Energy has two projects, is located in the heart of the geographical area of Norway that has the highest amounts of trapped energy from hydropower.
Mosjøen in Helgeland region
At the end of the 48 kilometres long Vefsnfjorden is Mosjøen – the oldest town on the coast of Helgeland. Today built around Alcoa’s massive aluminium smelter. And it’s no coincidence that Mosjøen is home to large-scale energy-intensive industry.
Mosjøen is located in the heart of the region with some of Norway’s largest hydropower resources, and still one of a few places in Norway with massive amounts of trapped renewable energy.
Nesbruket
At Nesbruket right next to Alcoas aluminium smelter, Gen 2 Energy is planning the build out of 195 MW of green hydrogen production capacity,

Farsund
situated at the southernmost tip of Norway, has been among the regions most impacted by rising European electricity prices in recent years. At the same time, it is where the energy from Norway’s first large-scale offshore wind farm will come ashore—without sufficient local demand or a high-capacity transmission network to distribute it effectively.

